{"id":67043,"date":"2011-05-03T11:55:26","date_gmt":"2011-05-03T09:55:26","guid":{"rendered":"https:\/\/grupoalava.rearmachine.com\/keys-to-success-in-the-maintenance-and-reliability-plan\/"},"modified":"2011-05-03T11:55:26","modified_gmt":"2011-05-03T09:55:26","slug":"keys-to-success-in-the-maintenance-and-reliability-plan","status":"publish","type":"post","link":"https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/","title":{"rendered":"Keys to Success in the Maintenance and Reliability Plan"},"content":{"rendered":"<p><span class=\"introduccion\">The Second Spanish Forum was attended by more than 270 maintenance and reliability professionals.<\/span><\/p>\n<div class=\"redesComparte\">\n<p>The Second Spanish Forum on Reliability and Predictive Maintenance toured twelve Spanish cities.<\/p>\n<p>We assessed the level of interest shown by the attendees through a survey in which, among other questions, participants were asked to rate the seven presentations given.<\/p>\n<p>All of the presentations were met with great interest by the attendees, although the one that received the highest score was <strong>\u201cKeys to Success in Maintenance and Reliability Planning.\u201d <\/strong> <\/p>\n<p><strong>To address the issues raised during the discussions regarding RCM and reliability, Preditec\/IRM has planned a course on this effective methodology, aimed at technicians and engineers in both maintenance and production, to explain and clarify the topics that sparked the debate.<\/strong><\/p>\n<p><strong><img decoding=\"async\" class=\"com\" title=\"evaluation-of-interest-in-presentations.jpg\" src=\"https:\/\/www.preditec.com\/rep\/21ba\/imagenes\/425602\/8\/valoracion-de-interes-en-ponenciasjpg.jpg\" alt=\"evaluation-of-interest-in-presentations.jpg\"><br \/>\n<\/strong><\/p>\n<p>Why and how to implement RCM in order to properly allocate maintenance tasks among RTF, PM, PdM, and PAM<\/p>\n<p>How these tasks, when properly distributed, contribute to increased production and better utilization of the plant&#8217;s design capacity, as well as to a reduction in maintenance costs<\/p>\n<p>What do the basic concepts used in reliability mean\u2014RER, MTTR, MTBF, Availability, Criticality, OEE&#8230;\u2014and how can they be used as indicators to justify and measure the financial results achieved by applying best practices in our work?<\/p>\n<p>Learn how to develop and manage an effective predictive maintenance plan\u2014the foundation of RCM\u2014and understand the techniques associated with it.<\/p>\n<p><strong>The course will be taught by our director of reliability, Jos\u00e9 P. Rayo Peinado, who has more than 30 years of experience in predictive maintenance and a reliability-focused approach.<\/strong><\/p>\n<p><em><strong><br \/>\nHistorical Development of Maintenance<\/strong><\/em><\/p>\n<p><em><strong>The Four Maintenance Tactics<\/strong><\/em><\/p>\n<ul>\n<li>Run-to-Failure (RTF) Maintenance<\/li>\n<li>Preventive Maintenance at Fixed Intervals (PM)<\/li>\n<li>Condition-Based or Predictive Maintenance (PdM)<\/li>\n<li>Proactive Maintenance<\/li>\n<\/ul>\n<p><em><strong>History of the RCM<\/strong><\/em><\/p>\n<p><em><strong>Some Basic Concepts<\/strong><\/em>: Reliability, RER, OPRER, MTTR, MTTF, MTBF, Availability, Criticality, OEE<\/p>\n<p><em><strong>Why and How to Implement RCM<\/strong><\/em> : System Grouping, Boundary Definition, Asset Inventory, Criticality, Functions, Functional Failures, Failure Modes, FMEA, FMECA<\/p>\n<p><strong><em>Assignment of Maintenance Tasks<\/em><\/strong>: RTF, PM, PdM, PdM Techniques, Vibration, Thermography, Oil Analysis, Ultrasonic Testing, MCA, PAM<\/p>\n<p><em><strong>How to Manage RCM<\/strong><\/em><br \/>\n<em><strong><br \/>\nProcess Indicators (KPIs)<br \/>\n<\/strong><\/em><\/p>\n<ul>\n<li>Dates: June 29 and 30, 2011.<\/li>\n<li>Location: Madrid<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Second Spanish Forum was attended by more than 270  [&#8230;]<\/p>\n","protected":false},"author":1,"featured_media":67044,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[8497],"tags":[],"class_list":["post-67043","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Keys to Success in the Maintenance and Reliability Plan - Grupo \u00c1lava<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Keys to Success in the Maintenance and Reliability Plan - Grupo \u00c1lava\" \/>\n<meta property=\"og:description\" content=\"The Second Spanish Forum was attended by more than 270 [...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/\" \/>\n<meta property=\"og:site_name\" content=\"Grupo \u00c1lava\" \/>\n<meta property=\"article:published_time\" content=\"2011-05-03T09:55:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/grupoalava.rearmachine.com\/wp-content\/uploads\/2025\/01\/rcm-claves-para-el-exito-en-el-plan-de-mantenimiento-y-fiabilidadjpg-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"256\" \/>\n\t<meta property=\"og:image:height\" content=\"150\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"ingenieros\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ingenieros\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/keys-to-success-in-the-maintenance-and-reliability-plan\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/keys-to-success-in-the-maintenance-and-reliability-plan\\\/\"},\"author\":{\"name\":\"ingenieros\",\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/#\\\/schema\\\/person\\\/4a437bb426dcf85df7d33342f7189670\"},\"headline\":\"Keys to Success in the Maintenance and Reliability Plan\",\"datePublished\":\"2011-05-03T09:55:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/keys-to-success-in-the-maintenance-and-reliability-plan\\\/\"},\"wordCount\":357,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/keys-to-success-in-the-maintenance-and-reliability-plan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/rcm-claves-para-el-exito-en-el-plan-de-mantenimiento-y-fiabilidadjpg-1.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/keys-to-success-in-the-maintenance-and-reliability-plan\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/keys-to-success-in-the-maintenance-and-reliability-plan\\\/\",\"url\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/keys-to-success-in-the-maintenance-and-reliability-plan\\\/\",\"name\":\"Keys to Success in the Maintenance and Reliability Plan - Grupo \u00c1lava\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/keys-to-success-in-the-maintenance-and-reliability-plan\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/keys-to-success-in-the-maintenance-and-reliability-plan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/rcm-claves-para-el-exito-en-el-plan-de-mantenimiento-y-fiabilidadjpg-1.jpg\",\"datePublished\":\"2011-05-03T09:55:26+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/#\\\/schema\\\/person\\\/4a437bb426dcf85df7d33342f7189670\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/keys-to-success-in-the-maintenance-and-reliability-plan\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/keys-to-success-in-the-maintenance-and-reliability-plan\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/keys-to-success-in-the-maintenance-and-reliability-plan\\\/#primaryimage\",\"url\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/rcm-claves-para-el-exito-en-el-plan-de-mantenimiento-y-fiabilidadjpg-1.jpg\",\"contentUrl\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/rcm-claves-para-el-exito-en-el-plan-de-mantenimiento-y-fiabilidadjpg-1.jpg\",\"width\":256,\"height\":150},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/keys-to-success-in-the-maintenance-and-reliability-plan\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Keys to Success in the Maintenance and Reliability Plan\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/\",\"name\":\"Grupo \u00c1lava\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/#\\\/schema\\\/person\\\/4a437bb426dcf85df7d33342f7189670\",\"name\":\"ingenieros\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/755a52ee3c6ff75b1828091f3b2983446c3a376832280cd6abb58fe1eb53954e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/755a52ee3c6ff75b1828091f3b2983446c3a376832280cd6abb58fe1eb53954e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/755a52ee3c6ff75b1828091f3b2983446c3a376832280cd6abb58fe1eb53954e?s=96&d=mm&r=g\",\"caption\":\"ingenieros\"},\"sameAs\":[\"https:\\\/\\\/grupoalava.rearmachine.com\"],\"url\":\"https:\\\/\\\/grupoalava.rearmachine.com\\\/en\\\/author\\\/ingenieros\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Keys to Success in the Maintenance and Reliability Plan - Grupo \u00c1lava","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Keys to Success in the Maintenance and Reliability Plan - Grupo \u00c1lava","og_description":"The Second Spanish Forum was attended by more than 270 [...]","og_url":"https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/","og_site_name":"Grupo \u00c1lava","article_published_time":"2011-05-03T09:55:26+00:00","og_image":[{"width":256,"height":150,"url":"https:\/\/grupoalava.rearmachine.com\/wp-content\/uploads\/2025\/01\/rcm-claves-para-el-exito-en-el-plan-de-mantenimiento-y-fiabilidadjpg-1.jpg","type":"image\/jpeg"}],"author":"ingenieros","twitter_card":"summary_large_image","twitter_misc":{"Written by":"ingenieros","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/#article","isPartOf":{"@id":"https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/"},"author":{"name":"ingenieros","@id":"https:\/\/grupoalava.rearmachine.com\/en\/#\/schema\/person\/4a437bb426dcf85df7d33342f7189670"},"headline":"Keys to Success in the Maintenance and Reliability Plan","datePublished":"2011-05-03T09:55:26+00:00","mainEntityOfPage":{"@id":"https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/"},"wordCount":357,"commentCount":0,"image":{"@id":"https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/#primaryimage"},"thumbnailUrl":"https:\/\/grupoalava.rearmachine.com\/wp-content\/uploads\/2025\/01\/rcm-claves-para-el-exito-en-el-plan-de-mantenimiento-y-fiabilidadjpg-1.jpg","articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/","url":"https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/","name":"Keys to Success in the Maintenance and Reliability Plan - Grupo \u00c1lava","isPartOf":{"@id":"https:\/\/grupoalava.rearmachine.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/#primaryimage"},"image":{"@id":"https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/#primaryimage"},"thumbnailUrl":"https:\/\/grupoalava.rearmachine.com\/wp-content\/uploads\/2025\/01\/rcm-claves-para-el-exito-en-el-plan-de-mantenimiento-y-fiabilidadjpg-1.jpg","datePublished":"2011-05-03T09:55:26+00:00","author":{"@id":"https:\/\/grupoalava.rearmachine.com\/en\/#\/schema\/person\/4a437bb426dcf85df7d33342f7189670"},"breadcrumb":{"@id":"https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/#primaryimage","url":"https:\/\/grupoalava.rearmachine.com\/wp-content\/uploads\/2025\/01\/rcm-claves-para-el-exito-en-el-plan-de-mantenimiento-y-fiabilidadjpg-1.jpg","contentUrl":"https:\/\/grupoalava.rearmachine.com\/wp-content\/uploads\/2025\/01\/rcm-claves-para-el-exito-en-el-plan-de-mantenimiento-y-fiabilidadjpg-1.jpg","width":256,"height":150},{"@type":"BreadcrumbList","@id":"https:\/\/grupoalava.rearmachine.com\/en\/keys-to-success-in-the-maintenance-and-reliability-plan\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/grupoalava.rearmachine.com\/en\/"},{"@type":"ListItem","position":2,"name":"Keys to Success in the Maintenance and Reliability Plan"}]},{"@type":"WebSite","@id":"https:\/\/grupoalava.rearmachine.com\/en\/#website","url":"https:\/\/grupoalava.rearmachine.com\/en\/","name":"Grupo \u00c1lava","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/grupoalava.rearmachine.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/grupoalava.rearmachine.com\/en\/#\/schema\/person\/4a437bb426dcf85df7d33342f7189670","name":"ingenieros","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/755a52ee3c6ff75b1828091f3b2983446c3a376832280cd6abb58fe1eb53954e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/755a52ee3c6ff75b1828091f3b2983446c3a376832280cd6abb58fe1eb53954e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/755a52ee3c6ff75b1828091f3b2983446c3a376832280cd6abb58fe1eb53954e?s=96&d=mm&r=g","caption":"ingenieros"},"sameAs":["https:\/\/grupoalava.rearmachine.com"],"url":"https:\/\/grupoalava.rearmachine.com\/en\/author\/ingenieros\/"}]}},"_links":{"self":[{"href":"https:\/\/grupoalava.rearmachine.com\/en\/wp-json\/wp\/v2\/posts\/67043","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/grupoalava.rearmachine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/grupoalava.rearmachine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/grupoalava.rearmachine.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/grupoalava.rearmachine.com\/en\/wp-json\/wp\/v2\/comments?post=67043"}],"version-history":[{"count":0,"href":"https:\/\/grupoalava.rearmachine.com\/en\/wp-json\/wp\/v2\/posts\/67043\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/grupoalava.rearmachine.com\/en\/wp-json\/wp\/v2\/media\/67044"}],"wp:attachment":[{"href":"https:\/\/grupoalava.rearmachine.com\/en\/wp-json\/wp\/v2\/media?parent=67043"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/grupoalava.rearmachine.com\/en\/wp-json\/wp\/v2\/categories?post=67043"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/grupoalava.rearmachine.com\/en\/wp-json\/wp\/v2\/tags?post=67043"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}