I&M Field Surveyor
Alava International
CANADA
I&M Field Surveyor
Required Qualifications/Education: Survey Engineering
Minimum Experience Required:
-
2+ years of experience as a surveyor
-
Database management
-
Instrumentation and Monitoring
Relevant Industry experience:
-
I&M Survey in tunnels and underground projects
-
I&M Survey in urban projects
Required equipment/instrumentation experience:
-
Leica, Trimble and/or Topcon Total Stations
-
Leica, Trimble and/or Topcon GPS
-
Leica, Trimble and/or Topcon data software
Additional Requirements:
-
Database management
-
Instrumentation and Monitoring
What we offer:
The Yonge North Subway Extension (YNSE) is a critical transit infrastructure project that will extend the existing line approximately 8 kilometers north from Finch Station. The planned extension includes the construction of more than 6 km of tunneling five new stations running primarily underground through densely populated urban and commercial areas.
Given the complex urban environment, which includes existing infrastructure, high-rise buildings, and sensitive utilities, the YNSE presents considerable geotechnical and structural challenges. Successful project delivery requires meticulous management of ground behavior and its impact on surrounding assets.
Alava International will be in charge of all the instrumentation and monitoring throughout the project to ensure a safer and smoother project execution. This includes the design of the monitoring plan, supply and installation of the instrumentation, data collection and analysis, reporting and coordination between the stakeholders, designers and operations.
