PROJECT OBJECTIVE
New railway platform
The project consisted of the construction of a new railway platform from the underpass of the C-31 highway to terminal T1 of Barcelona’s El Prat Airport.
The layout of the two tracks was more straight, connecting both terminals under the runways and terminating under Terminal T1, at the same point as Metro Line 9. Of the 4.5 km total, 2.8 km ran in an EPBtunnel.
This train offered faster and more direct access from the center of Barcelona, with frequencies of approximately 15 minutes, compared to the 30 minutes of the previous system.
How we made it happen
Action plan, services and instrumentation

OUR CONTRIBUTION
Some of our products and services applied to this project

Service
Technology consulting
We advise on the best technological solution to apply according to the needs of each project. Learn more about our technology consulting.

Service
Infrastructure process monitoring
We proposed a continuous monitoring of different geotechnical parameters through specialized instrumentation. Learn more about our monitoring service.
RESULTS AND ACHIEVEMENTS
Infrastructure monitoring
The monitoring system installed made it possible to maintain the airport runway in optimal conditions during the construction of the railway tunnel, recording the evolution of deformations in different sections and simulating possible seating basins caused by the tunnel boring machine.
Se proved to be a reliable solution for minimizing risks in other infrastructures other infrastructures, with rapid installation despite restricted access, and its and its data was validated by topographical measurements. measurements.