PROJECT OBJECTIVE
Improved mobility
The Barcelona City Council through its infrastructure company BIMSA begins the construction of the road underpass in Plaza de Glories. This infrastructure will improve mobility in a place of transport centralization and high traffic. For this purpose, the construction of underpasses with a North-South orientation is being carried out, divided into 4 lots.
These underpasses will cross other critical infrastructure such as commuter train lines. This crossing creates a delicate situation in an infrastructure that is in use by thousands of users.
How we made it happen
Monitoring system

OUR CONTRIBUTION
Some of our products and services applied to this project

Service
Technology consulting
We advise on the best technological solution to apply according to the needs of each project. Learn more about our technology consulting.

Service
Infrastructure process monitoring
We proposed a novel methodology for structural deformation monitoring. Learn more about our monitoring service.
RESULTS AND ACHIEVEMENTS
Deformation analysis
We implemented a continuous monitoring system that made it possible to analyze the evolution of deformations in the slabs of the railway infrastructure during the construction of the tunnel, with measurements every meter in four cross sections.
The frequency of data acquisition was configurable, and the system proved to be reliable in minimizing risks to other infrastructure during construction.